Indigo Point – Demolition Phase

by | Jul 5, 2021 | Uncategorized | 28 comments

Out initial plans for the reconstruction called for saving some of the existing structure. We thought there would be a cost savings by doing so. After we had completed our plans and were out to bid, one of the contractors said in passing, “You should tear it all down” . I stopped and said, “What would the cost difference be?”. Her answer was “Nothing”. I asked the other contractors bidding the work and they gave the same answer: “Nothing, and it will be a cleaner, better and more efficient build”. Gosh, we wish we knew that 11 months earlier. In any event, we decided to demolish the entire structure. This allowed us to make some key design changes that will make the end project so much better.

The demolition took all of four hours. The large barge arrived with two track hoe excavators and several dump trucks. One excavator built a barge landing area and a construction access road. The other went to work tearing down the guest cottage. Both excavators then met up to tear down the main house and load the debris onto the dump trucks. The trucks then took the debris down to a staging area for future haul off. I almost missed the demolition of the main house. I took the equipment owner over to Trellis Bay in the boat. By the time I returned 40 minutes later, there were only a few walls of the main house left standing. In the hands of skilled operators, it is amazing and somewhat scary what these machines can do. With the demolition completed, the next phase was laying out the new foundations.

28 Comments

  1. Ginger Shands

    It is scary how fast the walls came down!!! Can’t wait to see the finished product!!!

    Reply
    • admin

      Yes, indeed. Thanks Ginger. I appreciate all the support you and Rodney provide to me.

      Reply
  2. Terre Christensen

    Wow! Total commitment! This seems like a beautiful lot and I look forward to following your build. Thanks for including me!

    Reply
    • admin

      Thanks Terre. Can’t wait to have you and Kevin come visit.

      Reply
  3. Tom

    Sooooooo much work! We’re anxious to get you back here and talk with you about the new construction. Keep the pictures coming.

    Reply
    • admin

      Thanks Tom and Renee! Can’t wait to see you.

      Reply
  4. Rick & Cathi

    Very cool Dan!! It will be fun and interesting to keep watch on your blog here! I lived in Sopers’ Hole on Tortola for about nine months. If you’re interested we can correspond some about some consulting I did on typhoon damage risk reduction for schools in the western Pacific.

    Reply
    • admin

      Thank you. We like eating at Omar’s Fusion in Soper’s Hole, but it is a long drive across island. Our island, Great Camanoe is past East End, across Trellis Bay near Scrubb Island, as you surely know from your years here.
      That would be interesting to review. We are building to Dade County Florida building standards. We have flat 6″-8″ concrete roofs and hurricane rated windows and doors.

      Reply
      • Rick & Cathi

        Sounds good! One of the things we were looking at also was this Kevlar hurricane fabric to catch window glass fragments if/when the shutters were breached by coconut “bombs”. My favorite anchorage was next door to Great Camanoe, a place called Muskmelon Bay, but I heard a superyacht drug anchor in there and destroyed most of the coral beds. A super interesting dive site is there on Guana too, called “Grand Central”, a lava tube going up inside the island.

        Reply
        • admin

          Rick, can’t wait to have you and Cathi down to show me all the special spots. Sound like I need to get back in to scuba to hang with you. I have just been snorkeling. We are installing hurricane rated windows and doors. The sales rep says we will not need secondary protection like the Kevlar screens. Fingers crossed.

          Reply
  5. Gale

    How fun for you, Brigid and Summer to vision and create something. You’ll cherish the process and the result for sure!

    Reply
    • admin

      Thanks Gale.

      Reply
  6. Jeffrey Sanson

    This looks like a fun project! Can wait to see it finished.
    Jeff

    Reply
  7. John and Gretchen

    Wow quick work of the start of a big project. I enjoy see the progress.

    Reply
  8. Lisa and Phil Mahan

    Phil and I are both excited to be included in watching this process unfold! I had dinner with Susie a few nights ago and she told me about your latest venture. What a dream come true! So happy for you all…

    Reply
  9. admin

    Thanks for the support Lisa. Hope to see you and Phil soon.

    Reply
  10. Roberta Nerison-Low

    Wow, what a beautiful view you will have! I hope the build goes smoothly. Is there a town nearby where you can use as your base when you are overseeing the build?

    Reply
  11. Barbara Morgan

    Hi Dan and Brigid, holy cow, here today and gone tomorrow. That was a fast demolition. I have no doubt your design and vision will produce an amazing oasis!! YES, keep the pictures and comments about this journey coming.

    Reply
    • admin

      Thanks Barb.

      Reply
  12. Dan Kelly

    That’s neat to hear about the tear down process. Amazing how the things you take for granted in the states are a much bigger production in a different country and on an island. Too bad the rebuild doesn’t go as fast at the tear down right? I hope you had a good 4th of July and look forward to the next update

    Reply
    • admin

      Right you are Dan. Thank you.

      Reply
  13. Holly Macchiaroli

    Dan, this blog is a great idea! We’ve been thinking about you guys and how the project is going! Thanks for including us. Will be fun to track your progress in Paradise! We’ll be in touch!

    Reply
    • admin

      Holly, Thank you for the support. Hope to see you and Jim soon.

      Reply
  14. Susan N Mueller

    Oh my! How exciting! I am certain that you and Brigid will create a wonderful home to begin so many new an memorable times to share. Can’t wait to see how the progress comes along… best wishes for a smooth building process.

    Reply
    • admin

      Thanks Susan. We are excited.

      Reply
  15. Roger & Barb Nelson

    Your plans changed quite fast but you are good at adapting to situations like this. We look forward to following your progress

    Reply
    • admin

      Thanks Roger and Barb.

      Reply
  16. Tom

    Hey Dan,
    just writing a quick note so we can get our name on the list for updates whenever you post.

    Reply

Submit a Comment

Your email address will not be published. Required fields are marked *

Recent posts

A lot has Happened. Footings, floors, walls, roofs and plaster

A lot has Happened. Footings, floors, walls, roofs and plaster

First, an important note. Kimberly Rowe and Hugh Brock, the daughter and son in law of the previous owners, Ron and Claire Rowe, helped me get my blog in a more professional state. They have both been instrumental in making the blog easier to access and making it look...

YAHOO!! INDIGO POINT IS COMPLETED

YAHOO!! INDIGO POINT IS COMPLETED

Thanks to the tireless efforts of our contractor, ADC Construction, its numerous dedicated workers and ADC's Project Manager, Roshan Meade, Indigo Point was fully completed in mid-May 2022, one year after work began. As many of you know, I have spent the majority of...

GETTING CLOSER EVERY DAY, BUT STILL A WAYS TO GO

GETTING CLOSER EVERY DAY, BUT STILL A WAYS TO GO

I have been unbelievably busy the last two months and have not had the time to post. We have made substantial progress, but there is still a fair amount left to be done. The finish work takes time. I have been on island most of January and February. I did get home for...

FLOORS, DOORS, WINDOWS AND MORE

FLOORS, DOORS, WINDOWS AND MORE

A lot has happened since my last post. The windows and doors as well as tile and plumbing and light fixtures arrived in two shipping containers. The construction crew unloaded the containers and immediately went to work installing the doors and windows. The floors...

How did this ever come about? Part 2

How did this ever come about? Part 2

After the sailboat trip with the Craig family, we returned to Phoenix, Arizona on January 15, 2020. It was not long before I was on BVI Sothebys International Realty's website looking at the properties for sale on Great Camanoe Island. The person who I met on the...

How did this ever come about? Part 1

How did this ever come about? Part 1

There were a lot of events and "meant to be" occurrences that brought us to Indigo Point in the British Virgin Islands. The first was more than 63 years ago, before I was born. My mom, Donna, was 8 months pregnant with me when she and my dad, Glenn, plus my two older...

THE REBIRTH OF INDIGO POINT

THE REBIRTH OF INDIGO POINT

Indigo Point is a beautiful 4.4 acre site on Great Camanoe Island in the British Virgin Islands (BVI). Indigo Point was improved with a home and a guest cottage. Sadly, these structures were severely damaged by Hurricane Irma in 2017. The property was put up for sale...